Editorial corrections log.

A public log of editorial corrections made by Betway Today, with dates and the reasoning for each amendment.

Corrections log

What we have amended, with dates.

  • Editorial correction · 14 April 2026

    Removed a passing reference to a now-discontinued welcome offer. Current reviews do not publish offer amounts.

  • Editorial correction · 02 February 2026

    Amended the disclosure to reflect the use of /Login/playnow as the contextual route. We never publish the destination operator URL on this site.

  • Methodology update · 12 January 2026

    Adopted the criteria-led comparator: criteria only, no bonus-amount publication, no payout-percentage claim. Reviewers should treat payouts as unverifiable and decline to publish them.

  • Editorial correction · 04 December 2025

    Removed a stray bonus-amount figure from the bonus-code route and replaced it with a redirect to the operator's T&Cs.

How to report an error

Reader-reported corrections process.

If you spot a factual error on this site, write to the editor's address listed in the footer. We review reader-reported corrections within 5 working days, document the change here, and update the affected route.

What we correct

Types of corrections readers can expect to see in this log.

  • Factual errors in the rules walkthrough, meld anatomy or scoring ledger.
  • Outdated offer references — any bonus amount or promotion that has lapsed.
  • Verification errors when the operator's T&Cs change after publication.
  • Editorial voice slips that surface a structural label rather than the subject matter.

Each correction entry includes the date, the section affected, and a short note explaining what changed. We do not retroactively rewrite history.

Who reports

Corrections come from readers, the editor and the operator's T&Cs.

Most of the entries above originated from a reader noticing a stale figure, a new operator policy, or a change in the regulator's framework. The editor reviews each submission within five working days and either accepts (logging the change here) or declines (writing back with a short rationale). The operator's T&Cs remain the source of truth; we update this log when our work has been overtaken by a published operator change.

What we do not publish in this log

Three categories of correction we leave to the operator.

  • Live operator incidents — these are the operator's job to publicise; we link to the source rather than restate the claim.
  • Payment-rail outages — these are the rail's job to publish; we note them only when our coverage overlaps with the rail's status.
  • Third-party opinion pieces — these belong to the publisher; we do not adjudicate opinion corrections.